Medical equipment case studies
Proven Results

Case Studies

Real-world moves. Complex challenges. Zero-compromise outcomes. See how we've helped hospitals, research institutions, and surgery centers move their most critical equipment.

2,500+
Successful Moves
0
Equipment Damage Incidents
98%
On-Time Completion
500+
Healthcare Clients

Success Stories

Medical Equipment Moving Success Stories

Each move is unique. Here's how we've tackled complex medical equipment relocations across the country.

3T MRI System Relocation — New Hospital Tower
MRI Machine Moving
8-week planning + 1-night execution Siemens Magnetom Vida 3T MRI

3T MRI System Relocation — New Hospital Tower

Regional Medical Center, Houston TX

Challenge

A 750-bed regional hospital needed to move their Siemens Magnetom Vida 3T MRI to a new tower while maintaining clinical operations. The existing suite was on the 3rd floor with no direct freight access.

Solution

We engineered a custom rigging path using temporary structural supports and a specialized MRI sled system. Move was executed on a Saturday night from 10PM to 6AM.

Results

  • Zero clinical downtime — scanner operational Monday morning
  • Magnet quench successfully avoided
  • Full move completed in 8 hours
  • OEM accepted installation with no warranty issues
Full Laboratory Relocation — 18,000 Sq Ft Research Facility
Lab Moving Services
6-week planning + 72-hour execution HPLC systems, mass spectrometers, ultracentrifuges, cryogenic storage

Full Laboratory Relocation — 18,000 Sq Ft Research Facility

BioGen Research Institute, Boston MA

Challenge

A biotech research institute needed to relocate an active BSL-2 laboratory — including HPLC systems, mass spectrometers, ultracentrifuges, and cryogenic storage — across town with strict chain-of-custody requirements.

Solution

We assembled a 12-person specialized team with BSL-2 decontamination certification. All equipment was documented, decontaminated, and moved in a single 72-hour window over a holiday weekend.

Results

  • 18,000 sq ft lab relocated in 72 hours
  • Full chain-of-custody maintained for all samples
  • Zero equipment damage across 200+ items
  • Research resumed within 5 days of move completion
da Vinci Xi Surgical Robot — Cross-Country Transport
Surgical Robot Shipping
2-week coordination + 5-day transport Intuitive Surgical da Vinci Xi Surgical System

da Vinci Xi Surgical Robot — Cross-Country Transport

Specialty Surgery Center, Los Angeles CA

Challenge

A surgery center purchased a pre-owned da Vinci Xi system from a hospital in New York and needed it shipped safely to Los Angeles with full OEM acceptance at the destination.

Solution

Our team coordinated with Intuitive Surgical for the de-installation protocol. The system was custom-crated in 9 individual components and shipped via climate-controlled FTL transport with shock loggers.

Results

  • System arrived in perfect condition
  • Shock logger showed zero events exceeding 0.5G
  • Intuitive Surgical engineer completed acceptance testing
  • OR operational within 4 days of delivery
CT Scanner Upgrade — Coordinated Old-For-New Swap
CT Scanner Shipping
10-week multi-site planning + 48-hour execution GE Revolution CT / Siemens Somatom Force

CT Scanner Upgrade — Coordinated Old-For-New Swap

Imaging Center Group, Chicago IL

Challenge

A 5-site imaging center chain was replacing their GE Revolution CT scanners with Siemens Somatom Force systems at three locations simultaneously. They needed a coordinator to manage removal, shipping, and installation across all three sites on the same weekend.

Solution

We deployed three separate crews with a centralized operations coordinator. Old scanners were removed Friday night, new systems installed Saturday, and all three sites were scanning patients by Monday morning.

Results

  • 3 simultaneous site replacements in 48 hours
  • Zero revenue-day loss for any location
  • Old scanners delivered to equipment broker on schedule
  • All sites passed ACR phantom testing by Monday
Hospital Wing Renovation — 60-Piece Equipment Staging
Medical Equipment Movers
6-month ongoing engagement Patient monitoring, ventilators, infusion pumps

Hospital Wing Renovation — 60-Piece Equipment Staging

University Health System, Philadelphia PA

Challenge

During a major ICU renovation, a university hospital needed 60+ pieces of patient monitoring equipment, ventilators, and infusion pumps stored offsite and returned in precise sequence as rooms came back online.

Solution

We provided secure climate-controlled warehousing for all equipment, tracked each piece with RFID inventory, and delivered equipment in phased sequences matching the renovation schedule.

Results

  • 60+ items stored and staged over 6-month renovation
  • 100% inventory accuracy throughout
  • Phased delivery aligned with construction milestones
  • Zero delays to renovation timeline
PET/CT Scanner Move — Working Hospital with No Closure
PET Scanner Shipping
4-week planning + 12-hour execution Siemens Biograph mCT PET/CT Scanner

PET/CT Scanner Move — Working Hospital with No Closure

Cancer Treatment Center, Atlanta GA

Challenge

A busy cancer center needed to move their Siemens Biograph mCT PET/CT scanner 200 feet within the facility as part of a nuclear medicine department expansion — without closing the department.

Solution

We built a temporary shielded corridor for the transport path and executed the move in a single 12-hour overnight shift. Radiation safety compliance was maintained throughout with continuous RSO involvement.

Results

  • Scanner moved without patient schedule disruption
  • Continuous RSO-documented radiation safety compliance
  • Moved 200 feet within facility in one overnight shift
  • Clinical operations resumed the following morning

Start Your Project

Ready to Write Your Own Success Story?

Tell us about your medical equipment move and we'll create a plan that ensures the same zero-compromise outcome.